I've pretty much completed demolition in my master bath. I have some screws and trim to remove, as well as some more precise cutting on the walls, but the tile, shower and bathtub are gone. My goal is to re-sell the shower and bath on CL (hopefully I can get it posted this weekend), so we will see how that goes.
After I removed the bathtub, I was finally able to move the new tub and shower basin into the bathroom and get an impression for how my design will actually look. I am really happy with the tub, but am struggling with the shower basin. It isn't as big as I had hoped and I haven't quite figured out how I'm going to make the adjoining wall work between the shower and the tub.
Wednesday, June 20, 2007
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment